industrymro

TEMPLATES & TOOLS

MRO Spend Analysis: How to Analyse Your Purchases

By the IndustryMRO Team  •  7 min read  •  Published November 2026

Ask most plants how much they spent on bearings, fasteners or PPE last year and the answer is a guess. MRO buying is made up of many small orders, placed by different people, with different vendors, over many months. No single order looks big, so nobody adds them up. MRO spend analysis is the simple job of adding them up: collecting your purchases, grouping them and reading the pattern. This guide explains how to do it in six steps, using nothing more than a spreadsheet.

What Is MRO Spend Analysis?

MRO spend analysis means looking at what you bought over a period (usually 6 to 12 months), from whom, at what price, and whether it was planned or urgent. The aim is not a perfect report. It is to answer a few practical questions:

  • Which categories take most of the money?
  • How many vendors do we use, and how much goes to the top few?
  • Did we pay different prices for the same item?
  • How much did we buy in a hurry?

These answers show where small changes can save money and effort. They also show where to start if you want to reduce the number of MRO suppliers.

Why It Matters for MRO Buying

MRO items are often called tail spend: lots of low-value purchases that add up. Because they are small, they get less attention than raw materials. A spend analysis brings that hidden activity into one view. Plants commonly find the same few things:

  • Duplicate vendors for the same category, with orders split with no clear reason.
  • Price gaps for the same item bought from different vendors or in different months.
  • A high share of urgent buys, which usually means spares were not planned.
  • Uncategorised spend that nobody can explain.

The 6 Steps at a Glance

1
Collect 6 to 12 months of purchase data

Purchase orders, invoices and petty cash purchases.

2
Clean vendor and item names

One name per vendor and one name per item.

3
Group purchases by category

Bearings, fasteners, electricals, PPE and so on.

4
Total spend by category and vendor

See where the money goes.

5
Look for patterns

Vendor concentration, price gaps and urgent buys.

6
Decide actions and repeat

Pick two or three changes, then review again.

Step 1: Collect 6 to 12 Months of Purchase Data

Gather every MRO purchase from your accounts system, tally entries, purchase orders or Excel sheets. Include petty cash and direct purchases made by maintenance, because they are often the ones nobody records centrally. Twelve months is better than six, since some items are bought only once or twice a year.

For each purchase, you need the date, PO or invoice number, vendor, item, quantity and unit price. If one source is missing details, collect what you can and mark the gaps.

Step 2: Clean Vendor and Item Names

This is the least exciting step and the most important. “ABC Bearings”, “A.B.C. Bearings & Tools” and “abc bearing” will be counted as three vendors unless you fix them. The same goes for items: “6205 bearing”, “6205-2RS” and “bearing 6205 2rs” should be one item name. Choose one spelling for each and use it everywhere. Without this, every later total will be wrong.

Step 3: Group Purchases by Category

Give each purchase one category. A short list is enough for most plants:

  • Bearings
  • Fasteners
  • Electricals
  • Lubricants and oils
  • PPE and safety
  • Hand and power tools
  • Pneumatics and hydraulics
  • Welding and consumables
  • Cleaning and housekeeping
  • Other

Keep “Other” small. If “Other” is one of your biggest categories, your list is too short. Split it until no single bucket hides a large part of your spend.

Step 4: Total Spend by Category and Vendor

Now add it up. Calculate the total for each purchase (quantity × unit price), then total by category and by vendor. In Excel, the SUMIFS formula does this. For example, one SUMIFS formula can return the total spend for every row where the category is “Bearings”. Also note how many purchase lines each category and vendor has. Many small orders to one vendor tell a different story from one large order.

Step 5: Look for Patterns

With the totals ready, look at four things. Each finding points to an action:

What you seeWhat it can meanWhat to do
A category with many vendors and many small ordersSplit buying with no clear reasonConsider one primary and one backup supplier
A few vendors with most of your spendHigh dependence on those vendorsCheck delivery record, and keep a backup
The same item bought at different pricesNo standard rate or comparisonCompare quotes and agree a rate
A high share of urgent buysSpares were not plannedMake a list of critical spares and reorder points
Large “Not categorised” spendMissing or unclear recordsFix the data first, then re-run the analysis

A useful rule of thumb is to look at your top vendors and your most-bought items first. A small number of them usually account for a large share of the rupees, though the exact split differs from plant to plant.

Step 6: Decide Actions and Repeat

Do not try to fix everything. Pick two or three actions from Step 5, give each an owner and a date, and write down the numbers you started with. Then repeat the analysis after three to six months to see what changed. Spend analysis works best as a habit, not a one-time project.

Set Up Your Own MRO Spend Sheet

You can run this analysis in Excel or Google Sheets. Create one sheet with one row per purchase and these columns:

ColumnWhat to enter
DateDate of the purchase
PO / Invoice NoYour reference number
VendorOne consistent vendor name
ItemOne consistent item name
CategoryPick from your category list (Step 3)
Qty and Unit price (₹)Quantity and price per unit
Urgent buyYes for emergency purchases, otherwise No

Add a Total column (quantity × unit price), then use SUMIFS to total spend by category and by vendor, as described in Step 4. We are also preparing a ready-made Excel template and will add it to this page when it is ready.

Common Mistakes to Avoid

  • Using too little data. Three months can miss items bought once or twice a year.
  • Skipping the cleaning step. Uncleaned vendor names inflate your vendor count and hide your real top vendors.
  • Leaving out petty cash. Direct purchases by maintenance are often where urgent buying hides.
  • Putting too much in “Other”. A big “Other” hides the answer you came for.
  • Treating it as a one-time exercise. Without a repeat review, you cannot see whether anything improved.

Frequently Asked Questions

How much data do I need for MRO spend analysis?

Six months is a minimum and twelve is better. A full year includes items that are bought only once or twice, such as annual PPE or shutdown spares.

What is tail spend in MRO?

Tail spend is the large number of small, low-value purchases that together make up a meaningful part of total spend. MRO items are a common example.

Do I need special software?

No. A spreadsheet is enough to start. Excel or Google Sheets both work, and the main work is collecting and cleaning your data.

How often should I repeat the analysis?

Every three to six months is a good rhythm. Repeating it shows whether your actions changed prices, vendor numbers or the share of urgent buys.

What should I do with the results?

Pick two or three actions, such as consolidating vendors in one category, comparing quotes for your most-bought items, or planning spares for items you keep buying in a hurry.

Want fewer last-minute purchases?

Send us your requirement for one category and we will share a quote with the delivery date confirmed in writing before you order. Industrial buying should be planned, not panicked.

Send Us Your Requirement

For the wider picture, read our guide on what MRO procurement is.

Scroll to Top